India: Earthquake - ACT: 27-Mar-01

Action by Churches Together (ACT) Appeal - India - Gujarat Earthquake Relief & Rehabilitation - ASIN-11 (Revision 2) Appeal Target: US$ 9,128,940 Balance Requested from ACT Network: US$ 5,153,257 Geneva, 27 March 2001

A major earthquake devastated vast areas of Gujarat on 26 January, 2001, killing more than 20,000 people and rendering millions homeless. A total of 35 million people are affected. The impact of the earthquake is expected to worsen as there is a severe drought situation in the State: rains are more than 4 months away and it is getting hotter and drier by the day. This revision includes the proposal of Churches Auxiliary for Social Action (CASA) for the post-crisis phase. For detailed information on the projects by the Churches Auxiliary for Social Action (CASA) - crisis phase - Lutheran World Service India (LWS I) and United Evangelical Lutheran Churches of India (UELCI) please refer to the original ASIN-11 Appeal issued on 2 February and the ASIN-11 Revision issued on 14 February. Churches Auxiliary for Social Action (CASA) is proposing to develop reconstruction and rehabilitation activities in communities most affected by the earthquake as follows: Disaster resistant housing Village infrastructure Livelihood provisioning and security Establishment and support of community organisations and self help group Strengthening of local delivery institutions and disaster preparedness The housing and infrastructure activities will fulfil the guidelines defined by the Government of Gujarat. The Lutheran World Service India (LWSI) is preparing a revision of their proposal to include the mentioned guidelines in their reconstruction activities. Project Completion Date: March 31, 2002 Summary of Appeal Targets, Pledges/Contributions Received and Balance Requested Total Appeal Less: Pledges Balance Requested Targets /Contr. Recd from ACT Network External Eval. 60,000 11,540 48,460 ACT Comm. 20,000 6,471 13,529 Unallocated Funds 266,185 - 266,185 UELCI 1,015,387 352,757 662,630 LWS I 1,658,710 689,587 CASA 6,374,843 2,369,607 4,005,236 Total Target US$ 9,128,940 3,975,683 5,153,257 REQUESTING ACT MEMBER INFORMATION Church's Auxiliary For Social Action (CASA) IMPLEMENTING ACT MEMBER AND PARTNER INFORMATION The relief programme will be implemented directly by CASA, with the assistance of two partner organisations. The active participation of the local Churches and NGO partners in the area is assured. CASA is registered as a Society under the Societies' Registration Act XXI of 1860. Its members consist of 24 Protestant and Orthodox Churches in India and CASA functions as the outreach arm of these Churches. As the Related Agency of the National Council of Churches in India, CASA is mandated to do relief work on behalf of all the Protestant Churches. CASA has a history of responding to emergencies and disasters since 1947. CASA's response is regardless of caste, creed, language, ethnic origin or political affiliation. Operating on an all-India basis, CASA responds to 60-70 emergencies - both natural and man-made - per year. CASA has a decentralised disaster preparedness plan. This system has been created through the establishment of a wider and more effective infrastructure network and capacity building programme for CASA staff, representatives of Churches and identified partner organisations, both at the disaster management and grassroots level, who can respond to a call for assistance at short notice, in consultation with and on behalf of the Churches in India. This network is backed by relief materials purchased and pre-stocked at CASA's warehouses at strategic locations throughout the country. The quantum of relief material stored at these locations at any given time is determined on the basis of hazard mapping done by CASA, and is subject to constant review and update. Methodist Engineering Company (MEC) was established in 1952 with an objective to plan, design and construct buildings related to the Church organisation and to provide employment to the needy and in the course to train young persons in construction work. MEC is equipped with well-qualified and experienced staff apart from consultants of repute. Projects executed by MEC include churches, schools, hostels, hospitals and residences. MEC will be assisted in its work by M/s. Inbaraaj Consultants, a reputed Chennai based consultancy firm of Architects and Planners, which will be involved with the planning and supervision of the construction work. The Christian Medical Association of India (CMAI) is a charitable, Christian educational society and acts as the official health agency of the National Council of Churches in India (NCCI). It is related to a wide network of Protestant and Orthodox Churches. Its activities include: Prevention and relief of human suffering irrespective of caste, creed, community and economic status. Promotion of knowledge of factors governing health. Co-ordination of activities for training doctors, nurses, allied health professionals and others involved in the ministry of healing. Implementation of schemes for comprehensive health care, family planning, community welfare and disaster relief. CMAI will be assisting CASA in the implementation of the Trauma Counselling programme with the help of experts from Norwegian Church Aid and the National Institute of Mental Health and Neuro Sciences, Bangalore India DESCRIPTION OF THE EMERGENCY SITUATION Background A major earthquake devastated vast areas of Gujarat on 26 January, 2001, killing more than 20,000 people and rendering millions homeless. A total of 35 million people are affected. The impact of the earthquake is expected to worsen as there is a severe drought situation in the State: rains are more than 4 months away and it is getting hotter and drier by the day. Departments of the State and Central Governments, voluntary organisations and the international community are extending all possible aid for relief to the earthquake victims. Current Situation Immediate relief measures have been taken up in the priority areas of food, water, clothing and temporary shelter. CASA conducted its survey and relief operations in five sectors: Bhuj, Jamnagar, Rajkot, Rapar and Gandhidham, with a tactical headquarters set up in Rajkot to administer the relief programme. CASA began by distributing cooked food and drinking water pouches to quake survivors in rural areas for 10 days, and then distributed tarpaulins, relief sets, dry ration kits and lanterns. Each relief set contained one saree, one dhoti, two blankets and aluminium kitchen utensils (9 items). The dry ration kits contained 10 kg rice, 2 kg pulses, 2 kg gram flour, 2 litres cottonseed oil, 1 kg jaggery, 1 kg sugar, 1 kg salt and ½ kg tea. This initial relief assistance programme commenced on 27 January and was successfully completed by 28 February covering 35,000 families in 157 villages of Kutch, Rajkot and Jamnagar districts. CASA also received 1,000 metric tons of wheat from MCC which is being used for providing employment opportunities leading to the creation/restoration of village infrastructure including deepening/excavation of ponds, land reclamation, house site clearance and creating water collecting structures. A clear agenda for long term rehabilitation of the victims now needs to be drawn up, so as to put the implementation on the right track from the initial stages. The need for linking long term rehabilitation with developmental programmes incorporating preparedness and mitigation aspects to counter future disasters need to be paid special attention. This proposal outlines an approach for moving from relief to mid term rehabilitation and finally to long term rehabilitation in a cross sectoral, yet integrated manner. In view of the disaster prone characteristics of this area which is prone to earthquakes, cyclones and drought, it is desirable to base such a plan on a developmental framework with built-in factors of preparedness and mitigation. Such a plan will need to be tailored to the local needs and characteristics in order to be successful at the community level. Impact On Human Lives The official estimate of lives lost is reported as 20,000. The number of people seriously injured is put at 60,000. Description of Damages A severe earthquake of the magnitude of 7.9 on the Richter scale occurred on 26 January 2001 with its epicentre 20 kms North-East of Bhuj and 110 kms North-North East of Jamnagar in Rann of Kutch area of Gujarat. Worst Affected Areas District: Kutch: Talukas: Anjar, Bhachau, Bhuj, Gandhidham, and Rapar District: Ahmedabad: Taluka: Ahmedabad City District: Rajkot: Taluka: Morvi District: Jamnagar: Talukas: Dhrol and Jodiya Extent of Damage The earthquake was felt over a major part of the country and caused extensive damage to property and loss of life in Bhuj and nearby areas. Thousands of buildings have either totally collapsed or suffered extensive damage. The power and water supply was disrupted in the affected areas and telecom links were snapped. The strategic Suraj Bari Bridge connecting Kutch with other parts of State was damaged. Its impact has been felt in various parts of the Country but Gujarat has been severely affected. As per available information from State Government of Gujarat, the provisional extent of damage (as on 26.2.2001) is as follows: S. No. Districts of Gujarat Number of Persons Dead Injured 1. Ahmedabad 751 4,040 2. Amreli 00 5 3. Anand 01 20 4. Banaskantha 32 2,770 5. Bharuch 09 44 6. Bhavanagar 04 45 7. Gandhinagar 08 241 8. Jamnagar 119 4,930 9. Junagadh 08 89 10. Kachchh-Bhuj 18,415 136,048 11. Kheda 00 28 12. Mehsana 00 1,339 13. Navsari 17 52 14. Patan 38 1,695 15. Porbandar 09 90 16. Rajkot 433 11,951 17. Surat 46 190 18. Surendranagar 113 2,909 19. Sabarkantha 00 56 20. Vadodara 01 270 21 Valsad 00 - Total: 20,004 166,812 The figures published by the Government of Gujarat regarding loss to property are tabulated below: Loss of Property (Preliminary estimates - exact assessment is going on) Population affected 15.9 million Cattle Death 20,717 Houses Destroyed 175,000 Pucca, 167,000 Kachcha & 16,000 huts Houses Damaged 490,000 Pucca, 349,000 Kachcha & 34,000 huts Industrial establishments Rs. 50, 000 million Commercial establishments Rs. 30, 000 million Personal Properties Rs. 3, 870 million Household Properties Rs. 111, 950 million Public Utilities Rs. 6, 000 million Public Infrastructure & Amenities Rs. 10, 800 million Damage to Public Utilities Rs. 6, 000 million Total estimated loss Rs. 21, 8620 million Locations for Proposed Response CASA has put in place a rehabilitation task force drawn from its Western Zone which is being strengthened by the recruitment of local qualified and experienced staff with its field headquarters located at Rajkot. CASA will be operational in the districts of Jamnagar and Kutch covering 7 villages. The Government allots villages for long term rehabilitation to NGOs that have long standing experience and expertise in emergency and development and CASA has therefore been allotted 7 villages by Government of Gujarat which are as follows: Name of the Villages No. of houses Taluka District Kothariya Ambala Koyali Fatsar Kerali Jaliya Devani Kandrai 147 163 197 222 250 98 172 Jodiya Jodiya Jodiya Jodiya Jodiya Dhrol Bhuj Jamnagar Jamnagar Jamnagar Jamnagar Jamnagar Jamnagar Kutch The CASA Director and Chief Zonal Officer of the Western Zone will personally supervise the entire rehabilitation operation, as well as ensuring co-ordination with LWSI, UELCI, other church agencies, and grassroots partner organisations. GOAL & OBJECTIVES Goal: To achieve reconstruction and rehabilitation in communities most affected by the Earthquake, and to reduce risk at grassroots level through participatory disaster mitigation measures. Objectives: To assist in provision and promotion of : sustainable livelihoods through long term food and income sustainability as well as immediate food security disaster resistant physical infrastructure in the form of cyclone resistant housing and community assets community based disaster preparedness and mitigation measures including - village level institutions and operating systems awareness, education and training based capacity building self reliance mechanisms developmental programmes through co-ordination and networking for rehabilitation to development transition and addressing practical gender needs Activities and Outputs Reconstruction of houses : 1249 houses Reconstruction of village infrastructure: 7 schools, 7 panchayat ghars, 7 water supply systems and approach/internal roads in all 7 villages. Livelihood focussed activities : Livelihood opportunities for 1,249 families under livelihood security programme. Establishment and support of community organisations and self help groups. Disaster preparedness : awareness and skill upgrading of primary stakeholders and selected trainers and disaster managers. Provide trauma counselling services to the disaster victims. Design and implement training modules targeted at the trauma counselling needs of caregivers and the community. TARGETED BENEFICIARIES CASA will be targeting 1,249 affected families. Priority will be given to the most vulnerable sections among those affected such as women and children. Criteria used in Beneficiary Selection The programme will target beneficiaries from amongst the most vulnerable groups identified on the basis of post earthquake damage and assessment carried out in the field. Primary Stakeholders These will primarily include the marginalised section of the community who were lagging behind in development and have sustained greater impact due to low coping capacity. These will include: marginal and landless farmers, households headed by women, households that have lost breadwinners, children - particularly orphaned children, those with low access to basic services and education, families that have lost their means of livelihood and physically or socially challenged groups that have low coping capacities and have thus been rendered incapable of self-recovery after the earthquake. These same groups will be brought, through the developmental transition of the proposed programme, into the mainstream of the development process. The participatory approach, as well as the emphasis on local capacity building, will aim at enhancing internal capacities and reducing dependence on external support. Secondary Stakeholders These include primary schools, Panchayati Raj (local self government) institutions, village self help groups, health workers, masons, local NGOs and CBOs, Block Development Officers and District and State level relief, revenue, disaster management and rehabilitation bureaucrats and co-ordinators. Addressing the secondary stakeholders is expected to result in very wide impact of the programme through a filter down effect. Women's Needs Women's needs are of critical importance in view of the traditional social deprivation faced by them and the devastating impact of the earthquake that has left behind a large number of women headed households. PROPOSED EMERGENCY ASSISTANCE & IMPLEMENTATION Description of Assistance The salient features of the project is to rehabilitate the affected society socially, culturally and economically in a self sustaining environment that includes appropriate housing and civil amenities. It is aimed at making the programme a part of the total development of the affected areas. Disaster Resistant Housing Housing programmes in the affected areas need to be taken up using earthquake and cyclone resistant technology with low-cost local material and manpower. The construction activity itself will also create opportunities to employ and train local people as masons. This will get linked to the livelihood programme, and will build upon local capacity for upgrading of housing even beyond the completion of the rehabilitation programme. The 7 villages allotted to CASA fall under Package - I as defined by the Government of Gujarat in its Gazette. This package relates to villages where 70% houses have collapsed and the village needs to be relocated. The State Government will arrange for land on demand from the Gramsabha. In case Government land is not available the NGO to which the village is allotted would have to purchase the land required for relocation of the village with or without beneficiary contribution. The following are the salient feature of the Package-I Schedule. Area for a Normative Village of 200 households and population of 1000 : 12 Hctrs. Plot size and permissible carpet area: Sl. No. Category Plot Size (Sqr. Mtr.) Built up area (Sqr. Mtr.) 1. Landless 100 30 2. Marginal farmer (holding land up to 1 Hctr.) 150 30 3. Farmers holding land between 1 - 4 Hctrs. 250 30 4. Farmers holding above 4 Hctrs. 400 50 The village layout plan will be decided and provided by the Government. The Government is also responsible for deciding the categorisation of the beneficiary families based on their land holding. A total number of 1,249 houses of all three sizes prescribed above will be constructed. The village-wise details are as follows: Categorisation of Houses S.No. Dist. Taluka Name of village No. of houses 30 sq.m No. of houses 40 sq.m No. of houses 50 sq.m 1. Jamnagar Jodiya Kotharia 39 72 36 147 2. Ambala 95 53 15 163 3. Koyali 90 55 52 197 4. Fatsar 94 60 68 222 5. Kerali 97 60 93 250 6. Dhrol Jaliya Devani 25 45 28 98 7. Kutch Bhuj Kandrai 85 52 35 172 Total 525 397 327 1,249 All houses will be single storeyed and will be constructed using stone/brick masonry. The dimensions of the houses will be 300, 400 and 500 sq. ft. as per the categorisation given above. Each house will additionally be provided with a 25 sq.ft. toilet. The construction will be carried out as per Indian standard code of practice: A.S. 4326:1993. In this standard, the specified features of design and construction for earthquake resistance of buildings of conventional types are covered. Recommendations regarding restrictions on openings, provision of steel in various horizontal bands and vertical steel at corners and junctions in walls are based on a range of calculations made using steel design seismic coefficient and the ductility of steel reinforcement. Many of the provisions have also been verified experimentally on models by shake table tests. Such construction is also cyclone resistant. Below is a detailed estimate for the construction of houses: House Dimension: 300 Sft. + 25 Sft. for toilet = 325 Sft. S. No. Details of items Quantity Rate Amount 1. Cement 130 bags 130/bag 16,900.00 2. Stone Chips 500 cft. 10/cft. 5,000.00 3. Sand 650 cft. 8/cft. 5,200.00 4. Earth 300 cft. 3/cft. 900.00 5. Stone 450 cft. 7/cft. 3,150.00 6. Bricks 7,000 Nos. 1,400/1,000 9,800.00 7. Shuttering 800 sft. 8/sft.y 6,400.00 8. Steel reinforcement 500 kgs. 18/kgs. 9,000.00 9. Angle Iron, Steel etc. for doors & windows 220 kgs. 25/kgs. 5,500.00 10. Whitewashing L.S. 1,000.00 11. Labour charges 22,550.00 12. Tools, Planks & Scaffolding 3,200.00 Overhead & office expenses & Contractors Total Rs. Profit 10% 88,600.00 8,860.00 97,460.00 Rounded off to Rs. 97,500.00 The cost of earthquake resistant construction using materials as specified out above comes to Rs. 300/- per sq.ft. This figure has been used in the budget to compute the cost of all three categories of houses. Village infrastructure The task of reconstruction of village infrastructure also needs to be taken up on a priority basis to restore basic amenities and facilities necessary for regular functioning of the village. This is also a primary condition attached by the Government for allotment of villages to NGOs under Package I. The minimum infrastructure for each village will comprise one primary school (seven classrooms), one Panchayat office, a water supply system, drainage, 3.5 kilometres of roads (inside and approach), electrical wiring in all houses. School: It is proposed to construct a school in each village. This will essentially be a middle school i.e. to 7th standard in order to meet village requirements. The building will have an area of 3,600 sq.ft. with 7 class rooms and 2 small rooms for school office and principal's office. A toilet block for boys and girls will also be constructed. This being a public building with large spans it will be designed as an R.C.C. frame structure, incorporating earthquake and cyclone specifications according to the Indian Standards Code. Panchayat Office: The panchayat office is essential for the smooth working of the local self- government mechanism at the village level. It is proposed to construct a two-room building with a toilet block measuring 700 sq. fit of covered area using the same technical specifications as apply to the school building. Roads: An average of 3.5 kms of approach/internal road are required to be constructed in each village. The average width of the road will be 4 meters. The road will be surfaced with water bound macadam using stone aggregate blinding material and including screening, sorting, spreading to template and consolidating with road roller of 8 to 10 tons capacity. Water supply and Drainage: In order to provide water in the villages being re-constructed it is proposed to construct water storage tanks in each village with a capacity of 30,000 litres to store water being supplied by the government through tankers/pipeline. The tank will be an RCC structure resting on column footings. An electric pump will be installed for water delivery through the pipeline to be laid along the roads with taps provided at strategic locations. The pipeline to be laid in each village will measure approximately 3,500 running metres. Brick/stone masonry drains on an average of 5,250 running metres per village will also be constructed with necessary slopes along the roads to drain waste/surface water from the houses and roads. Livelihood Provisioning and Security There is an immediate need for the re-establishment of livelihood based food security. Activities that need to be taken up include assistance in restoration of economic activities through provision of seeds, fertiliser and agricultural implements to farmers, tools and implements to village artisans and the establishment of a diverse economic base through facilitation of wide-ranging vocations. Establishment and support of community organisations and self help group In all the programme villages the participation of the community will be ensured through a process of involving the community from the inception. The community will be organised into various groups such as Village Development Associations, Mahila mandals and Youth Groups . To empower women, self help groups will be initiated in all the villages. After group formation the identified leaders will be developed through HPD interventions to sustain their interest in the whole rehabilitation process. 7 VDAs, 7 Mahila Mandals, 7 youth groups and 14 self help groups will be established. Economic support will be given to the self help groups to enhance their income. Strengthening of Local Delivery Institutions and Disaster Preparedness The programme needs to be carried out in a manner that would enable smooth transition from a disaster rehabilitation programme into a developmental programme. Preparedness and mitigation need to be underlying principles in all activities taken up under the sub-programmes and their activities, with an aim to build the capacity of the local community to deal with future calamities efficiently. Preparedness measures are to include awareness campaigns, training of trainers and disaster managers and setting up of an information database. Local institutions such as schools, health service institutions and local self government are an effective means for broad-basing preparedness and mitigation measures. These institutions need to be strengthened in order to play a more pro-active role in the area of disaster management. Implementation Description Per Agency The programme will be implemented in co-operation with CASA0s partner agencies, secular and church related organisations. The responsibility for implementation of various facets of the programme have been conceptualised as follows: CASA: CASA will be the main implementing partner and will be directly responsible for the resource sharing partners in all respects. CASA will supervise and monitor the working of the other partners and complete periodic reporting on the progress of the programme. All finances will be received and accounted for by CASA. CASA will also be responsible for the livelihood provision components and security; community organisations and self-help groups and strengthening of local delivery institutions. All finances will be received and accounted for by CASA. MEC (Methodist Engineering Company): Projects executed by MEC include churches, schools, hostels, hospitals and residences. CASA and MEC joined forces in 1993 on the Maharashtra Earthquake Rehabilitation Program, a successful program that reconstructed seven villages including earthquake resistant houses, schools, community buildings and roads. MEC will be responsible for the above construction activities which will be monitored by CASA. CMAI: The Christian Medical Association of India will in collaboration with experts from Norwegian Church Aid and NIMHANS Bangalore take up the task of providing trauma counselling services to the disaster victims in these villages. They will also draw up and implement training modules targeted at the trauma counselling needs of caregivers and the community. Transition From Emergency The long term rehabilitation agenda items in the programme are aimed at establishing self-sustainable management systems that will continue to operate and grow even beyond the completion of the project. A special component of long term programme security is planned, which will cover participatory and co-operative management of food and income security programme through self help groups, enabling and upgrading of skills through a range of training programmes, education and awareness. ADMINISTRATION, FINANCE, MONITORING & REPORTING Administration CASA has worked in the area of disaster management and response for 52 years. Experience of the long term rehabilitation programme in Latur, Maharashtra after a similar devastating earthquake in 1993 will form a platform of knowledge and experience for implementing the proposed rehabilitation programme in Gujarat. The CASA Director is co-ordinating the overall operation from Delhi and in this he is being assisted by his staff at the head quarters level, which includes expertise in disaster response, logistics and emergency communications. The overall co-ordination at the zonal level is with the Chief Zonal Officer, Western Zone. CASA will operate in 2 districts. For a proper management and co-ordination, it is planned to set up field based implementation units with an overall co-ordination unit at Rajkot. Co-ordination, monitoring, consolidation of reports and accounting will be the main functions of the Rajkot Office. Finance Management and Controls Accounting will be maintained at the implementing unit levels by the qualified Accountants and the entire project account will be consolidated at Rajkot office on a monthly basis. The zonal office will scrutinise the accounts and submit the same to headquarters for onwards submission. Preparation of quarterly and yearly financial reports of the project and the final audit of the account would be done at the headquarters level. Monitoring Procedures Monitoring of the project would be done on a regular basis through field visits, submission of reports, staff-partner meetings and interaction with beneficiaries. CASA would ensure active involvement and participation of the beneficiaries, partner organisations, local government officials and Panchayat leaders in the implementation, monitoring and evaluation of the project activities. The programme will be constantly monitored to ensure that it progresses along the planned framework, and also in order to fine-tune it as and when required, based on field responses. The project component implementation will be monitored through time-based check lines for commissioning of physical infrastructure and completion of activities with recorded participation of targeted stakeholders. Progress Assessment Reports will be prepared on a regular basis. An evaluation will be carried out. This will be based on physically verifiable indicators for infrastructure development activities. Besides these, perceptional indicators will be instigated through a participatory appraisal and evaluation exercise that will be based on community perceptions. IMPLEMENTATION TIMETABLE The total project duration will be one year from its inception. CO-ORDINATION CASA head quarters will be constantly in touch with ACT and other members of the ACT network working in the operational area such as LWS and UELCI for complete transparency, information sharing and learning from each others' experiences. Links with development actors working within the project area pre-exist based on CASA's prior activities and NGO partnerships in the area. CASA has been directly operating development programmes in part of the affected area and has NGO partnerships in other parts since 1993. There are a total of 3 NGO partners in the area who have played an active role in post earthquake relief operations and will continue to provide local institutional support through the rehabilitation phase. Besides CASA will be working in co-ordination with other NGOs and will be networking with them to ensure a co-ordinated implementation of its programmes complementing and supplementing those being implemented by other agencies. CASA is already a member of the various Co-ordination Committees where the experiences and plans of the Government and NGOs are being shared on a regular basis for a better co-ordination of relief and rehabilitation efforts. So far, the focus of the out come of meetings has been on a more comprehensive and holistic approach to the rehabilitation programme in which the knowledge, experiences and aspiration of the referral community are to be ensured by the support organisations. CASA will continue to be a member of the committees for sharing and learning. CASA also visualises a great potential in terms of a future advocacy role being played by the committees. At the district, block and panchayat levels CASA is in constant touch with the Government authorities, local panchayat leaders and the NGOs. BUDGET Description Type of No. of Unit Cost Budget Budget Unit Units IR IR USD INCOME RECEIVED- through ACT Network via Geneva DanChurchAid/DANIDA 597,710 Presbyterian Church of Canada C$5,000 3,290 Hungarian Interchurch Aid HUF 500,000 1,763 International Orthodox Christian Churches (IOCC) 10,000 INCOME - Cash and In Kind direct Lutheran World Relief 25,000 Norwegian Church Aid NOK 2million 242,910 Church World Service, USA Blanket fund 75,000 DanChurchAid DKK200,000 24,691 Church World Service, USA Blanket fund 100,000 Diakonisches Werk K-IND-0102-0001-GU Euro 260,000 239,668 United Methodist Committee on Relief 100,000 Reformed Church in America 10,000 Baptist World Aid 20,000 United Church of Canada C$5,000 3,309 Lutheran World Relief 25,000 Church World Service, USA 200,000 Diakonia, Sweden 7,102 National Council of Churches, Japan 35,000 INCOME - Pledged Anglican Church of Canada C$15,000 9,959 Christian Aid/DFID £350,000 500,000 Presbyterian Disaster Assistance/PCUSA 75,000 Christian Aid/Irish Bishops £20,000 29,528 Diakonisches Werk K-IND-0102-0001-GU Euro 15,500 (for tents & airfreight -to WEM directly) 14,288 Diakonisches Werk K-IND-0102-0001-GU Euro 15,000 ( for vehicle -to WEM directly) 13,827 Diakonisches Werk K-IND-0102-0001-GU Not yet known medical- support for fractures, small devices/utensils 0 Anglican Church of Canada C$10,000 6,563 TOTAL INCOME 2,369,607 ESTIMATED EXPENDITURE Description Type of No. of Unit Cost Budget Budget Unit Units IR IR USD CRISIS PHASE DIRECT ASSISTANCE Food Relief Cooked Food Meal 600,000 10 6,000,000 130,435 Drinking Water Pouch 600,000 2 1,200,000 26,087 Dry Ration Kit Kit 35,000 400 14,000,000 304,348 Polybags for packing Piece 10,000 10 100,000 2,174 Sub total food Relief 21,300,000 463,043 Non Food Relief Aluminium Utensils Set 35,000 178 6,230,000 135,435 Saree Piece 35,000 85 2,975,000 64,674 Dhoti Piece 35,000 65 2,275,000 49,457 Acrylic Blankets Piece 35,000 105 3,675,000 79,891 Polythene bags for packing Piece 35,000 10 350,000 7,609 Tarpaulin Piece 35,000 600 21,000,000 456,522 Lantern Piece 35,000 60 2,100,000 45,652 Sub total Non Food Relief 38,605,000h 839,239 TRANSPORT, STORAGE, HANDLING & RELATED COSTS Truck rental & related costs for material movement Trip 100 15,000 1,500,000 32,609 PERSONNEL, ADMINISTRATION, OPERATIONS & OTHER SUPPORT COSTS Salaries & benefits, Admin & support lump sum 6,140,500 133,489 AUDIT & EVALUATION Audit of ACT Funds Month 3 15,000 45,000 978 TOTAL CRISIS PHASE 67,590,500 1,469,359 POST CRISIS PHASE Infrastructure Rehabilitation/ development Housing (325 sq ft. structures) house 525 97,500 51,187,500 1,112,772 Housing (425 sq ft. structures) house 397 127,500 50,617,500 1,100,380 Housing (525 sq ft. structures) house 327 157,500 51,502,500 1,119,620 WC Toilet with soak pit each house toilet 1,249 2,500 3,122,500 67,880 Community Infrastr- schools number 7 1,380,000 9,660,000 210,000 Community Infrastr - panchayat offices number 7 275,000 1,925,000 41,848 Community Infrastructure - roads km 24.5 800,000 19,600,000 426,087 WatSan (drainage channels) metres 36,750 300 11,025,000 239,674 WatSan (water pipeline ) metres 24,500 300 7,350,000 159,783 WatSan (water storage reservoir ) numbers 7 300,000 2,100,000 45,652 Sub total 208,090,000 4,523,696 Description Type of No. of Unit Cost Budget Budget Unit Units IR IR USD Livelihood Focussed Programmes Carpentry units unit 21 10,000 210,000 4,565 Tailoring units unit 14 3,000 42,000 913 Pottery units unit 14 5,000 70,000 1,522 Embroidery units unit 14 7,000 98,000 2,130 Electrician units unit 7 3,000 21,000 457 Small vending units unit 35 30,000 1,050,000 22,826 Farm implements set 210 1,500 315,000 6,848 Fodder for livestock ton 2,100 1,200 2,520,000 54,783 Milch animals for women's groups unit 70 10,000 700,000 15,217 Sheep rearing unit 700 2,000 1,400,000 30,435 Econ. support for self help groups group 21 25,000 525,000 11,413 Seeds (Millets and Chickpea) ton 700 1,500 1,050,000 22,826 Farm Yard Manure pits pit 210 3,000 630,000 13,696 Percolation tank repairs unit 7 50,000 350,000 7,609 Construction of check dams unit 7 200,000 1,400,000 30,435 Sub total 10,381,000 225,674 Community Organisation and Capacity Building Leadership Dev. Programmes programme 21 2,500 52,500 1,141 Skill Development Programme programme 2 5,000 10,000 217 Self-help group training programme 14 2,500 35,000 761 Entrepreneurship Dev. programme 7 3,000 21,000 457 Field exposure programme 7 10,000 70,000 1,522 Staff Development Programme programme 4 10,000 40,000 870 TOT module development module 1 25,000 25,000 543 TOT for village representatives programme 1 50,000 50,000 1,087 Trauma counselling programme for reference community programme 7 4,000 28,000 609 Support for trauma counselling programme 7 20,000 140,000 3,043 Disaster preparedness programme for the villagers programme 14 5,000 70,000 1,522 Disaster preparedness posters lumpsum 1 75,000 75,000 1,630 Documentation lumpsum 1 250,000 250,000 5,435 Sub total 866,500 18,837 CAPITAL EQUIPMENT ( Over USD 500) Office Equipment Computers and peripherals unit 1 110,000 110,000 2,391 Photocopier unit 1 100,000 100,000 2,174 Office furnishings lump sum 1 150,000 150,000 3,261 Generator unit 7 35,000 245,000 5,326 Communications Equipment Telephone and fax equipment unit 1 35,000 35,000 761 Vehicles Mopeds unit 7 27,000 189,000 4,109 Motorcycle unit 5 45,000 225,000 4,891 Utility vehicle (4 wheeler) unit 2 450,000 900,000 19,565 Sub total 1,954,000 42,478 Description Type of No. of Unit Cost Budget Budget Unit Units IR IR USD PERSONNEL, ADMINISTRATION, OPERATIONS & OTHER SUPPORT COSTS Salaries & benefits Coordinator (1) month 12 10,000 120,000 2,609 Development Officer (1) month 12 8,500 102,000 2,217 Project Engineer (1) month 12 8,500 102,000 2,217 PR/Documentation Officer (1) month 12 8,500 102,000 2,217 Accountant (1) month 12 5,000 60,000 1,304 Admin. Assistant (1) month 12 4,500 54,000 1,174 Field Officers (4) month 12 22,000 264,000 5,739 Supervisor (1) month 12 4,500 54,000 1,174 Stenographer (1) month 12 4,000 48,000 1,043 Male Community Organiser (7) month 12 28,000 336,000 7,304 Female Community Organiser (7) month 12 28,000 336,000 7,304 Support Staff (10) month 12 40,000 480,000 10,435 Travel Local & Regional travel (15 per) month 180 4,000 720,000 15,652 Hotel accommodation (for outstation staff and visitors) month 12 40,000 480,000 10,435 Office operations Office rental month 12 8,000 96,000 2,087 Office utilities month 12 3,000 36,000 783 Office Stationary and supplies month 12 5,000 60,000 1,304 Communications Telephone and Fax month 12 10,000 120,000 2,609 Mobile telephony month 12 4,000 48,000 1,043 Vehicle Operations Fuel/maint. charges for 7 mopeds month 12 4,900 58,800 1,278 Fuel/maint. charges 5 motorcycles month 12 10,000 120,000 2,609 Fuel/maint. 2 utility vehicles month 12 22,000 264,000 5,739 Other Admin / Support Costs Reporting, Promotion & Visibility month 12 20,000 240,000 5,217 Sub total 4,300,800 93,496 TOTAL POST CRISIS 225,592,300 4,904,180 AUDIT & EVALUATION Audit of ACT Funds lump sum 60,000 1,304 TOTAL EXPENDITURE 293,242,800 6,374,843 BALANCE REQUESTED FROM ACT NETWORK 4,005,236 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - Action by Churches Together (ACT) is a worldwide alliance of churches and their related agencies, meeting human need through co-ordinated emergency response. The ACT Coordinating Office is based with the World Council of Churches (WCC) and the Lutheran World Federation (LWF) in Switzerland. - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - Ecumenical Centre Phone: ++41-22-791.60.33 150, route de Ferney Fax: ++41-22-791.65.06 P.O. Box 2100 E-Mail: act@wcc-coe.org 1211 Geneva 2 Telex: 415 730 OIK CH Switzerland http://www.act-intl.org distributed by - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - Center for International Disaster Information Volunteers in Technical Assistance web: www.cidi.org listserv: www.cidi.org/listsub.htm - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - comments/suggestions/requests to incident@cidi.org